ACARP ACARP ACARP ACARP
Underground

Self Drilling Rock Bolt Technology - Development of Self Drilling Rock Bolt

Underground » Roadway Development

Published: June 07Project Number: C11028

Get ReportAuthor: Peter Gray | Ground Support Services

A new Self Drilling Rock Bolt (SDRB) system has been developed which uses a pumpable resin system for full column resin encapsulation for immediate roof and rib support. A new drilling and injection system has also been developed to enable fast and efficient bolt installation.

This new SDRB provides higher tensile strength than conventional solid bolts, and also provides a load transfer capacity that is almost double that of conventional bolts. This new SDRB uses low viscosity pumpable resin to ensure full encapsulation right down to the collar. This not only provides a high load transfer capacity over the entire
length of the bolt, but also reduces the potential for bolt corrosion and locks the bearing plate and mesh in place at the borehole collar. It will also reduce the amount of water inflow from the roof in mines which have water problems. The advantages of this alone are considerable.

The installation system is also new and consists of a new drill chuck and resin pump which can be retro-fitted onto a continuous miner. Production versions of the installation system can have full PLC control to further refine bolt installation to have full semi-automatic bolt installation. In addition, resin cure times can be adjusted to suit mine roof conditions such that the resin cure time coincides with full resin encapsulation of the bolt to further reduce installation cycle time.

The current SDRB installation cycle has not yet been fully optimised, and further reductions in bolt cycle time are possible. Nevertheless, the current SDRB installation cycle times for a 2m long bolt are typically 60 seconds,  compared to 150 seconds for a conventional bolt in the same roof.

The full benefits of SDRB technology to the coal industry will only be obtained if these bolts are installed at the face. In the immediate future, this requires retro-fitting the SDRB equipment onto existing continuous miners, and some miners are better suited to this application than others.

This new SDRB uses semi-automatic bolt installation with manual placement of the bolt into the drill chuck, which greatly simplifies the whole installation process. Although a longer term goal would obviously be to have full bolting automation, with bolt handling into the drill chuck to remove operators from unsupported roof. Consideration needs to be given not just to the bolting process itself, but also to the materials re-supply to the machine. This will be essential if high roadway drivage rates are to be achieved.

Longer term the coal industry should encourage machine manufacturers to design and produce machines that are better suited to SDRBs and to full bolting automation.

Underground

Health and safety, productivity and environment initiatives.

Recently Completed Projects

C33029Review Longwall Face Ventilation To Mitigate Goaf Gas Emissions Onto Walkways And Tailgate End

As longwall mining increasingly targets deeper coal seams, managing ...

C29009Control Of Transient Touch Voltages During Switching

There have been an increasing number of electric shock incidents rep...

C29025Effectiveness Of Shotcrete In Underground Coal Mines

The primary objective of this project is to quantify the effectivene...

Underground

Open Cut

Safety, productivity and the right to operate are priorities for open cut mine research.

Open Cut

Coal Preparation

Maximising throughput and yield while minimising costs and emissions.

Recently Completed Projects

C34041A Coal Spiral For The 2020S

The objective of this project is to develop an enhanced coal process...

C33057Foreign Contaminants Detection On Conveyor Belts Using Digital Imaging Processing Techniques And Coal Penetrating Sensors

This project was initiated to tackle the ongoing issue of foreign co...

C29065Wash Plant Fines Testing Methods Enhancement

Accurately estimating the proportion of expected fine size material ...

Coal Preparation

Technical Market Support

Market acceptance and emphasising the advantages of Australian coals.

Recently Completed Projects

C34054Scoping Study: Design Of Cokes From Biomass-Coal Blends For Sustainable Blast Furnace Ironmaking

There is an increasing focus on improving the environmental sustaina...

C34058Strength Development In Fouling Deposits

When coal is combusted in a boiler, the fly ash that is produced flo...

C34059Coke Reactivity With CO2 And H2O And Impacts On Coke Microstructure And Gas Diffusion

With the global shift to low-carbon ironmaking, partial substitution...

Technical Market Support

Mine Site Greenhouse Gas Mitigation

Mitigating greenhouse gas emissions from the production of coal.

Recently Completed Projects

C34066Safe Operation Of Catalytic Reactors For The Oxidation Of VAM Operating Under Abnormal Reaction Conditions

The catalyst Pd/TS-1 has shown excellent activity in oxidising venti...

C28076Selective Absorption Of Methane By Ionic Liquids (SAMIL)

This third and final stage of this project was the culmination of a ...

C29069Low-Cost Catalyst Materials For Effective VAM Catalytic Oxidation

Application of ventilation air methane (VAM) thermal oxidiser requir...

Mine Site Greenhouse Gas Mitigation

Low Emission Coal Use

Step-change technologies aimed at reducing greenhouse gas emissions.

Recently Completed Projects

C17060BGasification Of Australian Coals

Four Australian coals were trialled in the Siemens 5 MWth pilot scale ga...

C17060AOxyfuel Technology For Carbon Capture And Storage Critical Clean Coal Technology - Interim Support

The status of oxy-fuel technology for first-generation plant is indicate...

C18007Review Of Underground Coal Gasification

This report consists of a broad review of underground coal gasification,...

Low Emission Coal Use

Mining And The Community

The relationship between mines and the local community.

Recently Completed Projects

C16027Assessing Housing And Labour Market Impacts Of Mining Developments In Bowen Basin Communities

The focus of this ACARP-funded project has been to identify a number...

C22029Understanding And Managing Cumulative Impacts Of Coal Mining And Other Land Uses In Regions With Diversified Economies

The coal industry operates in the context of competing land-uses that sh...

C23016Approval And Planning Assessment Of Black Coal Mines In NSW And Qld: A Review Of Economic Assessment Techniques

This reports on issues surrounding economic assessment and analysis ...

Mining And The Community

NERDDC

National Energy Research,Development & Demonstration Council (NERDDC) reports - pre 1992.

Recently Completed Projects

1609-C1609Self Heating of Spoil Piles from Open Cut Coal Mines

Self Heating of Spoil Piles from Open Cut Coal Mines

1301-C1301Stress Control Methods for Optimised Development...

Stress Control Methods for Optimised Development and Extraction Operations

0033-C1356Commissioned Report: Australian Thermal Coals...

Commissioned Report: Australian Thermal Coals - An Industry Handbook

NERDDC